Home / References
References
34 projects, from the most recent to the oldest. For each project: the date, the title, the country and the assignment.
For confidentiality reasons, only the country of each project is given. The 23 projects since 2024 were carried out by HYDROTECH. 18 of them are described in detail, with their maps, on the Projects page.
2026
River
Restoration of a river and its structures
France
Feasibility study for the restoration of a river and its tributary: coupled 1D/2D HEC-RAS model, eight design configurations and six reference flows.
View the project and mapsEnergy storage
Flood risk at an energy storage site
France
Investigation of recurring flooding: catchments, T10, T25 and T100 design storms, HEC-RAS 2D of existing and design conditions, minimum platform level and drainage improvements.
Solar PV and wind
Hydrological and hydraulic studies for solar PV and wind projects
Tanzania
Catchments, rainfall analysis and IDF curves, unsteady HEC-RAS 2D. Depths, velocities, erosion and retention times, then drainage and protection measures.
Model review
Review of a hydrological study and hydraulic model for river restoration
France
Full technical review: flows, geometry, structures, roughness, mesh, boundary conditions, calibration, scenarios and results.
2025
Solar PV
127 ha solar PV plant and its grid connection line
Italy
Hydrology, depths, velocities, hazard, erosion and drainage of the plant and its 23 km line, for four return periods from 10 to 100 years.
View the project and mapsSolar PV
4.5 ha solar PV plant
France
Hydrology, pluvial flooding, erosion and stormwater management for T25 to T100, up to the detailed drainage design.
View the project and mapsSolar PV
Solar PV plant, 16 km² contributing catchment
Sweden
Rainfall-runoff response, depths, velocities, hazard and erosion for T50 and T100, during construction and operation.
View the project and mapsRiver
Wet meadow restoration along a river
France
Hydraulic effects of restoration along 3 km of river: 2D models in existing and design conditions for the 2-year, 10-year and 100-year floods.
View the project and mapsWind
Two wind farms
Oman
Water recession time after development for T25 and T100. One of the farms drains in less than 48 h, against a 72 h criterion.
View the project and mapsSolar PV
414 ha solar PV plant
Italy
Nine hydraulic plots: runoff, hazard, velocities and erosion from T25 to T500, ditches and erosion protection.
View the project and mapsSolar PV
Solar PV plant on eleven plots
Italy
Depths, velocities, hazard and erosion from T25 to T500 across eleven 2D models, preliminary drainage.
View the project and mapsFlooding
Flood protection programme
Comoros
1D/2D hydraulic modelling of flood risk in the context of climate change, contribution to hazard maps and to the planning of protection works.
Solar PV
Solar PV plant spread over 11 sites
Romania
Catchment analysis, meteorological and climate assessment, hydraulic modelling for the selected return periods and recommendations.
2024
Solar PV
181 ha solar PV plant
Bulgaria
180.6 ha and 229.1 MWp: hydrology, pluvial flooding, hazard, erosion and stormwater management from T25 to T200.
View the project and mapsSolar PV
184 ha solar PV plant
Chile
Runoff, ponding areas and hydraulic risk from T5 to T100, preliminary drainage design.
View the project and mapsSolar PV
121 ha solar PV plant
Chile
Contributing catchments, depths, velocities, erosion and drainage for seven return periods, from T2 to T200.
View the project and mapsSolar PV
60 ha solar PV plant
Senegal
Runoff and ponding from T10 to T100, preliminary drainage and stormwater management measures.
View the project and mapsSolar PV
52 ha solar PV plant
Italy
Hazard, velocities and erosion from T25 to T500, preliminary drainage recommendations.
View the project and mapsSolar PV
30 ha solar PV plant
Italy
Runoff, depths, velocities, erosion and preliminary drainage from T25 to T500.
View the project and mapsSolar PV
29 ha solar PV plant
Germany
Runoff, ponding and risk from T25 to T100, drainage and erosion control measures.
View the project and mapsSolar PV
17 ha solar PV plant
Germany
Runoff, ponding and risk from T10 to T500, preliminary drainage measures.
View the project and mapsSolar PV
16 ha solar PV plant
Chile
Runoff, ponding areas and risk from T5 to T100, preliminary drainage design.
View the project and mapsSolar PV
14 ha solar PV plant
Chile
Runoff, velocities, erosion and risk from T10 to T100, drainage measures.
View the project and maps
Before the firm was founded
Earlier experience, 2019 to 2022
Assignments carried out by Anouar Kaouachi as a hydraulic engineer and hydrologist, before HYDROTECH was founded in 2024.
2022
River
Modelling of an urban river
India
Hydrological study, river modelling and proposed solutions.
Tenders
Technical proposals for hydraulic projects
Morocco and Cameroon
Data collection and analysis, technical writing and preparation of bid documents.
2021
Dam
Dam feasibility study
Portugal
Hydrological study, dam break modelling and hazard map.
Dam
Dam safety
Portugal
Dam break scenarios in HEC-RAS and associated hazard maps.
Energy
Identification of hydropower and solar PV sites
Mozambique and Angola
Search for high-potential sites, supported by hydrological analyses and an assessment of water resources.
Drinking water
Water supply master plan
Angola
Master plan model in EPANET.
Drinking water
Extension of drinking water networks in three cities
Togo
Master plan model in EPANET.
River
River management and planning
Timor-Leste
Hydrological study, river modelling and proposed solutions.
2020
Hydropower
Hydropower scheme
Angola
Hydrological regime of the river, flood modelling, design flows for the structures and contribution to the spillway design.
2019
Hydropower
Hydropower scheme
Guinea-Bissau
Hydrological study and spillway design.
Energy
Pumped-storage plant sites
Morocco
Hydrological assessment of the sites, water balance, GIS multi-criteria selection and ranking by principal component analysis.