34 projects, from the most recent to the oldest. For each project: the date, the title, the country and the assignment.

For confidentiality reasons, only the country of each project is given. The 23 projects since 2024 were carried out by HYDROTECH. 18 of them are described in detail, with their maps, on the Projects page.

2026

  1. River

    Restoration of a river and its structures

    France

    Feasibility study for the restoration of a river and its tributary: coupled 1D/2D HEC-RAS model, eight design configurations and six reference flows.

    View the project and maps
  2. Energy storage

    Flood risk at an energy storage site

    France

    Investigation of recurring flooding: catchments, T10, T25 and T100 design storms, HEC-RAS 2D of existing and design conditions, minimum platform level and drainage improvements.

  3. Solar PV and wind

    Hydrological and hydraulic studies for solar PV and wind projects

    Tanzania

    Catchments, rainfall analysis and IDF curves, unsteady HEC-RAS 2D. Depths, velocities, erosion and retention times, then drainage and protection measures.

  4. Model review

    Review of a hydrological study and hydraulic model for river restoration

    France

    Full technical review: flows, geometry, structures, roughness, mesh, boundary conditions, calibration, scenarios and results.

2025

  1. Solar PV

    127 ha solar PV plant and its grid connection line

    Italy

    Hydrology, depths, velocities, hazard, erosion and drainage of the plant and its 23 km line, for four return periods from 10 to 100 years.

    View the project and maps
  2. Solar PV

    4.5 ha solar PV plant

    France

    Hydrology, pluvial flooding, erosion and stormwater management for T25 to T100, up to the detailed drainage design.

    View the project and maps
  3. Solar PV

    Solar PV plant, 16 km² contributing catchment

    Sweden

    Rainfall-runoff response, depths, velocities, hazard and erosion for T50 and T100, during construction and operation.

    View the project and maps
  4. River

    Wet meadow restoration along a river

    France

    Hydraulic effects of restoration along 3 km of river: 2D models in existing and design conditions for the 2-year, 10-year and 100-year floods.

    View the project and maps
  5. Wind

    Two wind farms

    Oman

    Water recession time after development for T25 and T100. One of the farms drains in less than 48 h, against a 72 h criterion.

    View the project and maps
  6. Solar PV

    414 ha solar PV plant

    Italy

    Nine hydraulic plots: runoff, hazard, velocities and erosion from T25 to T500, ditches and erosion protection.

    View the project and maps
  7. Solar PV

    Solar PV plant on eleven plots

    Italy

    Depths, velocities, hazard and erosion from T25 to T500 across eleven 2D models, preliminary drainage.

    View the project and maps
  8. Flooding

    Flood protection programme

    Comoros

    1D/2D hydraulic modelling of flood risk in the context of climate change, contribution to hazard maps and to the planning of protection works.

  9. Solar PV

    Solar PV plant spread over 11 sites

    Romania

    Catchment analysis, meteorological and climate assessment, hydraulic modelling for the selected return periods and recommendations.

2024

  1. Solar PV

    181 ha solar PV plant

    Bulgaria

    180.6 ha and 229.1 MWp: hydrology, pluvial flooding, hazard, erosion and stormwater management from T25 to T200.

    View the project and maps
  2. Solar PV

    184 ha solar PV plant

    Chile

    Runoff, ponding areas and hydraulic risk from T5 to T100, preliminary drainage design.

    View the project and maps
  3. Solar PV

    121 ha solar PV plant

    Chile

    Contributing catchments, depths, velocities, erosion and drainage for seven return periods, from T2 to T200.

    View the project and maps
  4. Solar PV

    60 ha solar PV plant

    Senegal

    Runoff and ponding from T10 to T100, preliminary drainage and stormwater management measures.

    View the project and maps
  5. Solar PV

    52 ha solar PV plant

    Italy

    Hazard, velocities and erosion from T25 to T500, preliminary drainage recommendations.

    View the project and maps
  6. Solar PV

    30 ha solar PV plant

    Italy

    Runoff, depths, velocities, erosion and preliminary drainage from T25 to T500.

    View the project and maps
  7. Solar PV

    29 ha solar PV plant

    Germany

    Runoff, ponding and risk from T25 to T100, drainage and erosion control measures.

    View the project and maps
  8. Solar PV

    17 ha solar PV plant

    Germany

    Runoff, ponding and risk from T10 to T500, preliminary drainage measures.

    View the project and maps
  9. Solar PV

    16 ha solar PV plant

    Chile

    Runoff, ponding areas and risk from T5 to T100, preliminary drainage design.

    View the project and maps
  10. Solar PV

    14 ha solar PV plant

    Chile

    Runoff, velocities, erosion and risk from T10 to T100, drainage measures.

    View the project and maps

Before the firm was founded

Earlier experience, 2019 to 2022

Assignments carried out by Anouar Kaouachi as a hydraulic engineer and hydrologist, before HYDROTECH was founded in 2024.

2022

  1. River

    Modelling of an urban river

    India

    Hydrological study, river modelling and proposed solutions.

  2. Tenders

    Technical proposals for hydraulic projects

    Morocco and Cameroon

    Data collection and analysis, technical writing and preparation of bid documents.

2021

  1. Dam

    Dam feasibility study

    Portugal

    Hydrological study, dam break modelling and hazard map.

  2. Dam

    Dam safety

    Portugal

    Dam break scenarios in HEC-RAS and associated hazard maps.

  3. Energy

    Identification of hydropower and solar PV sites

    Mozambique and Angola

    Search for high-potential sites, supported by hydrological analyses and an assessment of water resources.

  4. Drinking water

    Water supply master plan

    Angola

    Master plan model in EPANET.

  5. Drinking water

    Extension of drinking water networks in three cities

    Togo

    Master plan model in EPANET.

  6. River

    River management and planning

    Timor-Leste

    Hydrological study, river modelling and proposed solutions.

2020

  1. Hydropower

    Hydropower scheme

    Angola

    Hydrological regime of the river, flood modelling, design flows for the structures and contribution to the spillway design.

2019

  1. Hydropower

    Hydropower scheme

    Guinea-Bissau

    Hydrological study and spillway design.

  2. Energy

    Pumped-storage plant sites

    Morocco

    Hydrological assessment of the sites, water balance, GIS multi-criteria selection and ranking by principal component analysis.

A similar project to study?

Tell us the type of site, the country and the project stage. We will share the closest references and a proposal.